top of page
Search


Ghosts of Pattullo: Temporary Works in Bridge Construction - End Span Superstructure Bracing
Before the end span of the new Pattullo Bridge—now known as the stal̕əw̓asəm (Riverview) Bridge—could behave as a cable-stayed structure, it relied on a carefully engineered system of temporary bracing. This article explores how those short-lived elements provided critical stability during construction, then disappeared without a trace.

Raj Singh
Feb 34 min read


Ghosts of Pattullo: Temporary Works in Bridge Construction – TP3 (Part B)
Temporary works must do more than carry load—they must manage settlement, seismic demand, and constructability under real-world constraints. Part B of this article explores how the TP3 temporary tower was engineered to mitigate settlement, redirect seismic forces, support construction sequencing, and then be removed without a trace.

Raj Singh
Jan 283 min read


Ghosts of Pattullo: Temporary Works in Bridge Construction – TP3 (Part A)
Temporary works play a critical role in building major bridges, yet disappear once construction is complete. This article explores the TP3 temporary tower that supported the Pattullo Bridge end span for six months, enabling construction to proceed before the stay cables were engaged—and leaving no trace once its job was done.

Raj Singh
Jan 214 min read


Bridge Design Soil-Structure Interaction Series Post#3: Abutment Piles in Lateral Spreading Areas
Bridge abutment piles in lateral spreading zones experience "back-rotation" due to superstructure restraint, challenging conventional design

Lalinda Weerasekara, Ph.D., P.Eng.
Apr 3, 20253 min read


Bridge Design Soil-Structure Interaction Series Post#1: Pile Depth of Fixity
Pile depth-of-fixity: A critical yet misunderstood concept in deep foundation design. Structural and geotechnical engineers must align on it

Saqib Khan
Nov 26, 20243 min read


New Biweekly Series: Advanced Bridge Design and Seismic Soil-Structure Interaction
Dive into bridge design and seismic soil-structure interaction in our biweekly series. Explore pile analysis and performance based design.

Saqib Khan
Nov 18, 20242 min read


Seismic Isolation in Bridge Design #7: Performance Overview and Foundation Design Considerations
Discover the impact of seismic isolation in bridge design with a focus on foundation considerations. Explore the cost and construction effic

Varun Garg
Apr 17, 20243 min read


Seismic Isolation in Bridge Design #5: Analysis with Friction Pendulum Bearings
Transitioning from traditional seismic design approaches, this post delves into the innovative realm of seismic isolation techniques,...

Varun Garg
Mar 26, 20244 min read


Seismic Isolation in Bridge Design #4: Analysis with Fixed & Free Bearings
In our exploration of seismic isolation in bridge design, we've covered the importance of seismic forces and detailed the loading and...

Varun Garg
Mar 19, 20243 min read


Seismic Isolation in Bridge Design #3: Loading and Seismic Parameters
In the construction and design of bridges, understanding the forces that act upon the structure is critical. This post delves into the...

Varun Garg
Mar 5, 20243 min read


Seismic Isolation in Bridge Design #2: Bridge Configuration and Modeling
In structural engineering, designing, and analyzing bridges require a deep understanding of structural dynamics and a nuanced approach to...

Varun Garg
Feb 26, 20242 min read


Performance-Based Seismic Design of Bridges Series at the BC MoTI - Part 2
On February 22, 2024, the Spannovation Group held the second session of its three-part series on seismic design for bridge structures at...

Raj Singh
Feb 22, 20241 min read


Introduction to Seismic Isolation in Bridge Design
We're excited to share with you an 8-part series that dives deep into the fascinating world of seismic isolation in bridge design. This...

Varun Garg
Feb 22, 20245 min read
bottom of page
