top of page
Search


CASE STUDY: Tandem Lift of the Mount Hunter Creek Bridge Girder Pairs
In 2009, the Mount Hunter Creek Bridge was constructed to replace an old, non-composite two-lane structure on the Trans-Canada Highway,...

Raj Singh
Apr 4, 20244 min read
Â
Â
Â


Constructability in Bridge Design #6: Cranes Types for Bridge Erection
The most prevalent and cost-effective technique for bridge girder erection involves the use of cranes. This method, however, requires...

Raj Singh
Mar 28, 20243 min read
Â
Â
Â


Seismic Isolation in Bridge Design #5: Analysis with Friction Pendulum Bearings
Transitioning from traditional seismic design approaches, this post delves into the innovative realm of seismic isolation techniques,...

Varun Garg
Mar 26, 20244 min read
Â
Â
Â
bottom of page
